AUD 1.59M on-prem. AUD 400–700k sovereign in the cloud.
The recommended 8× H200 stack lands at AUD 1,590k over three years (range 1,270k–2,050k). An Australian-region cloud-sovereign deployment — Claude Opus 4.7 on AWS Bedrock-Sydney or GPT-5.5 on Azure Australia East under negotiated DPAs — lands at AUD 400–700k and closes the capability gap.
Same axis · same currency · same three-year window
On-prem · 8× H200
capex hardware, opex run, compliance wrap
Hardware620k
Rack / install70k
Power · 3 yrs50k
Setup80k
Platform eng · 0.5 FTE540k
IRAP + E8 + ISO180k
Surveillance60k
Midpoint1,590krange 1,270 – 2,050
Cloud-sovereign · AU region
Claude on Bedrock-Sydney or GPT-5.5 on Azure AU East, under negotiated DPAs
Cloud-sovereign · AU regionClaude on Bedrock-Sydney or GPT-5.5 on Azure AU East, under negotiated DPAs
low 400kmid 550khigh 700k
0500k1.0M1.5M2.0M
≈ 30–50% of on-prem≈ 550krange 400 – 700
Andcloud-sovereign closes the capability gap on §II, because the same DPA buys access to GPT-5.5, Claude Opus 4.7, or Gemini 3.1 Pro at the frontier rather than three to six months behind it.
·Hardware
8-GPU H200 SXM HGX node, fully integrated, 3-yr enterprise support — the largest single line
E8 ML2 uplift + ISO 27001 certification + IRAP at PROTECTED — six- to nine-month programme
AUD 180k
·Setup · one-off
model deploy, vLLM / TRT-LLM tune, observability, infrastructure-as-code
AUD 80k
·Install + rack + UPS + switching
42U rack, 16 kVA UPS, in-row cooling, 400 GbE ToR switch, NVLink cabling, freight, commissioning
AUD 70k
·Surveillance · 3 yrs
ISO surveillance audits + IRAP biennial re-assessment + Statement of Applicability maintenance
AUD 60k
·Power · 3 yrs
≈ 10 kW at 80% duty × 24/7 at NSW commercial blended ~25 c/kWh
AUD 50k
·Cloud-sovereign alternative
AWS Sydney / Azure AU East under DPA; capability at the frontier, ops and compliance burden largely absorbed
AUD 400 – 700k
SourceOn-prem frontier LLM briefing, §3.1 Stack A and §4 Dominant alternatives. Hardware quotes from Australian distributors (Hyperscalers AU, Broadberry AU, XENON) or reseller-indication estimates marked as such — NVIDIA does not publish HGX list prices. USD/AUD planning rate 1.50, above RBA spot ≈ 1.38 to absorb FX and procurement variance. Cloud-sovereign range from the briefing's §4 paragraph and reflects typical 30–50% of on-prem TCO for this workload profile.